Job description
Company culture :
Alten Maroc is defined by a deeply collaborative culture, focused on people, trust, and strong team support, with hands-on managers who guide and develop talent.
This environment is enhanced by a strong drive for innovation, encouraging creativity, initiative, and experimentation across projects.
A structured and disciplined organization ensures efficiency, rigor, and quality in engineering delivery.
Performance and ambition are part of the culture as well, supporting collective success while maintaining a positive and caring atmosphere.
Job :
1. Baselining Activity
Creation of the initial baseline:
This baseline represents the initial state of all configurable elements, including specifications, plans, hardware components, software, technical documents, etc.
Change management:
Changes can be proposed at any time and can concern any element of the project, such as a design modification, a software update, a component change, etc.
Comparison with the initial baseline:
At each step of the baselining process, changes are compared to the initial baseline to evaluate their impact and compliance with project specifications and requirements.
Baseline update:
When a change is approved and validated, it is integrated into the next baseline to create a new reference. Through this process, the baseline continuously evolves throughout the project.
Traceability and consistency:
The baseline serves as the reference for tracking changes applied to components. It ensures traceability, meaning the ability to follow the history of changes over time, and guarantees consistency between different parts of the project.
Verification and audit:
Configuration management, including the creation of baselines, is subject to periodic checks and audits to ensure compliance with standards, regulations, and project requirements.
2. Change Management Activity
Identification of the change request:
The process begins with identifying a change request, which may come from the software development team, users who encountered a problem with their vehicle, or a regulatory compliance audit.
Evaluation of the change request:
Once identified, the request is evaluated based on several criteria: its relevance, its impact on the affected components and systems, and the criticality of the associated risks. This initial analysis determines whether the request is acceptable and can be submitted for approval.
Creation of the change proposal:
If the request is deemed relevant, a technical solution proposal is developed. This proposal must include detailed information about the nature of the modification, its objective, the configurable parameters affected, and the risks associated with its implementation.
Review and approval:
The change proposal is reviewed and evaluated during a decision-making committee. The requestor presents the solution to experts who analyze its feasibility, relevance, and impacts.
Change implementation:
Once approved, the change can be implemented. In the case of an electronic control unit (ECU), this may involve modifying the embedded software code, the electronic microcomponent, or updating calibration or configuration files.
Testing and verification:
After implementation, non-regression tests are carried out to verify that the modification has been correctly integrated, that it has not generated new malfunctions, and that it meets the project requirements.
Validation:
Following successful tests and verifications, the change is validated to confirm that it meets the project needs and can be integrated into the overall configuration.
Documentation:
All steps of the change management process (requests, proposals, approvals, tests, verifications, and validations) are fully documented to ensure complete traceability.
Required profile :
- Industrial Engineer degree or equivalent
- Experience: 6 months - 1 year, in the automotive sector
- Knowledge in mechanics: Solid foundation in mechanical engineering and production engineering, strength of materials, Machine Directive, welded parts
- Technical English
وصف الوظيفة
ثقافة الشركة :
Alten Maroc تُعرَّف بثقافة تعاونية عميقة تركز على الناس، الثقة، ودعم الفريق القوي، مع مديرين عمليين يوجهون و يطورون المواهب.
هذا البيئة تعززها دافع قوي للالابتكار، تشجع الإبداع والمبادرة والتجريب عبر المشاريع.
تنظيم منضبط ومهيكل يضمن الكفاءة، الصرامة، والجودة في تسليم الهندسة.
الأداء وطموح جزء من الثقافة أيضاً، يدعم النجاح الجماعي مع الحفاظ على أجواء إيجابية ومهتمة.
الوظيفة :
1. نشاط قاعد الأساس
إنشاء القاعدة الأساسية الأولية:
هذه القاعدة تمثل الحالة الأولية لجميع العناصر القابلة للتكوين، بما في ذلك المواصفات، الخطط، مكونات الأجهزة، البرمجيات، المستندات الفنية، الخ.
إدارة التغيير:
يمكن اقتراح التغييرات في أي وقت ويمكن أن تتعلق بأي عنصر من عناصر المشروع، مثل تعديل التصميم، تحديث البرمجيات، تغيير المكون، الخ.
المقارنة مع القاعدة الأساسية الأولية:
في كل خطوة من عملية التأسيس، يتم مقارنة التغييرات بالقاعدة الأساسية الأولية لتقييم تأثيرها والامتثال للمواصفات والمتطلبات.
تحديث القاعدة الأساسية:
عندما يتم اعتماد التغيير والتحقق من صحته، يتم دمجه في القاعدة التالية لخلق مرجع جديد. من خلال هذه العملية، تتطور القاعدة باستمرار طوال المشروع.
التتبّع والاتساق:
تعمل القاعدة كمرجع لتتبع التغييرات المطبقة على المكونات. تضمن التتبّع، أي القدرة على متابعة تاريخ التغييرات مع مرور الوقت، وتضمن الاتساق بين أجزاء المشروع المختلفة.
التحقق والتدقيق:
إدارة التكوين، بما في ذلك إنشاء القواعد الأساسية، عرضة للفحص والتدقيق الدوريين لضمان الالتزام بالمعايير واللوائح ومتطلبات المشروع.
2. نشاط إدارة التغيير
تحديد طلب التغيير:
تبدأ العملية بتحديد طلب تغيير، قد يأتي من فريق تطوير البرمجيات، أو مستخدمين واجهوا مشكلة في مركبتهم، أو تدقيق امتثال تنظيمي.
تقييم طلب التغيير:
بمجرد تحديده، يتم تقييم الطلب بناءً على عدة معايير: أهميته، تأثيره على المكونات والأنظمة المتأثرة، وخطورة المخاطر المرتبطة به. هذا التحليل الأولي يحدد ما إذا كان الطلب مقبولاً ويمكن تقديمه للموافقة.
إنشاء اقتراح التغيير:
إذا كان الطلب ذا صلة، يتم تطوير اقتراح حل تقني. يجب أن يتضمن هذا الاقتراح معلومات تفصيلية حول طبيعة التعديل، هدفه، المعامل القابلة للتكوين المتأثرة، والمخاطر المرتبطة بتنفيذه.
المراجعة والموافقة:
يُراجع اقتراح التغيير ويُقيّم خلال لجنة اتخاذ القرار. يعرض مقدّم الطلب الحل على الخبراء الذين يحللون جدواه وصلته وتأثيراته.
تنفيذ التغيير:
بعد الموافقة، يمكن تنفيذ التغيير. في حالة وحدة تحكم إلكترونية (ECU)، قد يتضمن ذلك تعديل كود البرمجيات المدمجة، أو المكون الإلكتروني الدقيق، أو تحديث ملفات المعايرة أو التكوين.
الاختبار والتحقق:
بعد التنفيذ، تُجرى اختبارات عدم التراجع للتحقق من أن التعديل مُدمج بشكل صحيح، وأنه لم يGenerate أعطال جديدة، وأنه يفي بمتطلبات المشروع.
الاعتماد:
بعد نجاح الاختبارات والتحقّقات، يتم اعتماد التغيير للتأكد من أنه يلبّي احتياجات المشروع ويمكن دمجه في التكوين العام.
الوثائق:
كافة خطوات عملية إدارة التغيير (الطلبات، المقترحات، الموافقات، الاختبارات، التحققات، والاعتمادات) موثقة بالكامل لضمان التتبّع الكامل.
الملف الشخصي المطلوب :
- درجة مهندس صناعي أو ما يعادلها
- الخبرة: 6 أشهر - 1 سنة، في قطاع السيارات
- المعرفة في الميكانيكا: أساس قوي في الهندسة الميكانيكية وهندسة الإنتاج، قوة المواد، توجيه الآلة، الأجزاء الملحومة
- الإنجليزية التقنية